{"id":3852,"date":"2023-03-28T03:38:37","date_gmt":"2023-03-27T14:38:37","guid":{"rendered":"https:\/\/thebuzz.apnanetwork.co.nz\/?p=3852"},"modified":"2023-03-28T03:38:37","modified_gmt":"2023-03-27T14:38:37","slug":"coromandel-months-yet-before-decision-on-sh25a-road-fix","status":"publish","type":"post","link":"https:\/\/thebuzz.apnanetwork.co.nz\/?p=3852","title":{"rendered":"Coromandel: Months yet before decision on SH25A road fix"},"content":{"rendered":"<p>The east coast of the Coromandel remains largely cut off from the rest of the country, with access in and out severely impacted by landslides.<\/p>\n<p>A fix for State Highway 25A will\u00a0not be in place before Christmas, but engineers are drawing closer to a decision on the best path forward.<\/p>\n<p>On Monday, media were allowed a rare glimpse into the cavernous divide that effectively splits the peninsula in two.<\/p>\n<p>A 140m stretch of road is missing from SH25A, which has\u00a0been closed since cracks appeared on 27 January\u00a0in the wake of ex-Cyclone Hale.<\/p>\n<p>The site now resembles\u00a0a quarry, with much of the initial debris cleared from the slip.<\/p>\n<p>But site managers reminded reporters of the dangers that lingered under the surface, instructing them to stick to the paths carved out unless they wanted to sink waist-deep into a quicksand-like substance.<\/p>\n<p>A decision on what would become of this route may yet take another two months.<\/p>\n<p>Waka Kotahi regional manager of infrastructure delivery Jo Wilton said there were three options on the table.<\/p>\n<p>&#8220;Reinstate the road using some form of retaining, a bridge option, and then a bypass, which is where we&#8217;d look at going around the slip, up the hill.&#8221;<\/p>\n<p>&nbsp;<\/p>\n<p>SOURCE RNZ<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The east coast of the Coromandel remains largely cut off from the rest of the country, with access in and out severely impacted by landslides. A fix for State Highway 25A will\u00a0not be in place before Christmas, but engineers are drawing closer to a decision on the best path forward. On Monday, media were allowed [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":3853,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[222,174],"tags":[],"class_list":["post-3852","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest-news","category-nz-news"],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/thebuzz.apnanetwork.co.nz\/index.php?rest_route=\/wp\/v2\/posts\/3852","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thebuzz.apnanetwork.co.nz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thebuzz.apnanetwork.co.nz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thebuzz.apnanetwork.co.nz\/index.php?rest_route=\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/thebuzz.apnanetwork.co.nz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3852"}],"version-history":[{"count":1,"href":"https:\/\/thebuzz.apnanetwork.co.nz\/index.php?rest_route=\/wp\/v2\/posts\/3852\/revisions"}],"predecessor-version":[{"id":3854,"href":"https:\/\/thebuzz.apnanetwork.co.nz\/index.php?rest_route=\/wp\/v2\/posts\/3852\/revisions\/3854"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thebuzz.apnanetwork.co.nz\/index.php?rest_route=\/wp\/v2\/media\/3853"}],"wp:attachment":[{"href":"https:\/\/thebuzz.apnanetwork.co.nz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3852"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thebuzz.apnanetwork.co.nz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3852"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thebuzz.apnanetwork.co.nz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3852"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}