{"id":12985,"date":"2025-03-11T13:19:22","date_gmt":"2025-03-11T00:19:22","guid":{"rendered":"https:\/\/thebuzz.apnanetwork.co.nz\/?p=12985"},"modified":"2025-03-11T13:19:22","modified_gmt":"2025-03-11T00:19:22","slug":"cancer-patients-left-with-no-hot-water-in-auckland-hospital-ward","status":"publish","type":"post","link":"https:\/\/thebuzz.apnanetwork.co.nz\/?p=12985","title":{"rendered":"Cancer patients left with no hot water in Auckland hospital ward"},"content":{"rendered":"<p>A man who was seriously ill with cancer and underwent a bone marrow transplant at Auckland City Hospital last year had to boil water in a kettle and use a disposable vomit bowl to wash themselves, because the ward had no running hot water.<\/p>\n<p>Health New Zealand (HNZ) confirmed it became aware of water heating and pressure issues in the support building in 2023, and a partial replacement of the heating plant in mid-2024 &#8220;did not meet expectations&#8221; &#8211; meaning that while hot running water was now available, intermittent issues were ongoing.<\/p>\n<p>A number of water leaks at Auckland hospitals have occurred recently, including a\u00a0<a href=\"https:\/\/www.rnz.co.nz\/news\/national\/540300\/water-in-main-auckland-hospital-building-shut-off-for-up-to-10-hours\">water outage at Auckland City hospital in January<\/a>, and a\u00a0<a href=\"https:\/\/www.rnz.co.nz\/news\/national\/543982\/surgeries-deferred-because-of-power-outage-at-greenlane-clinical-centre\">power outage at the Greenlane Clinical Centre<\/a> last week after a water leak damaged circuit boards.<\/p>\n<p>Andrew Mackintosh, who had lymphoma, was staying in Auckland City Hospital&#8217;s hematology ward for five weeks in September last year as he underwent a bone marrow transplant.<\/p>\n<p>The ward is part of a 45,000 sqm facility built in stages between 1965 and 1971, and has a range of ageing infrastructure issues.<\/p>\n<p>Mackintosh said cleanliness was critical to patients like him who are severely immunocompromised and prone to infections that would increase the risks of dying during the process.<\/p>\n<p>He had a private bathroom in his room, and the bedsheets had to be changed daily.<\/p>\n<p>Mackintosh said the shower was not working and there was no running hot water 90 percent of the time.<\/p>\n<p>&#8220;The water was very, very low pressure like a trickle going down the handle as opposed to a shower spray coming out of the shower, and it was nearly always cold, so even if it had been warm the flow wasn&#8217;t enough to wash under,&#8221; he said.<\/p>\n<p>Mackintosh said he had to resort to filling disposable vomit containers with kettle-boiled water, then washing with a cloth.<\/p>\n<p>He said it was a struggle to wash in this way in his weakened state.<\/p>\n<p>&#8220;Every day it would be a task that I would dread coming in the day, it was just a real undertaking to go through it physically, so that was the starting point, but then I had the anxiety around the fact that i wasn&#8217;t doing a good enough job [washing] and worrying that it would be a real negative impact on my situation,&#8221; he said.<\/p>\n<p>Mackintosh said the nurses provided good care for him, but were helpless to fix the water problem.<\/p>\n<p>He said the hot water supply was also intermittent when he was staying in the same ward at Auckland City Hospital for chemotherapy in late 2023.<\/p>\n<p>Mackintosh said he was angry and frustrated, and has heard that other bone marrow transplant patients also had similar challenges with water at the hospital.<\/p>\n<p>&#8220;If it had been a short isolated thing and it was just me, I could accept that, but the fact that patients today will be going in to that same room, or that same set of rooms, and having the same problems that I grappled with.<\/p>\n<p>&#8220;And having their very expensive, very difficult bone marrow transplant process put at risk because of such a simple thing as not providing suitable hot water, it just seems a crazy thing to be doing, a crazy thing to be allowing to continue for so long,&#8221; he said.<\/p>\n<p>HNZ spokesperson Chris Cardwell said in a statement that he acknowledged the patient&#8217;s experience and accepted that &#8220;we did not deliver the quality of care we aspire to&#8221;.<\/p>\n<p>&#8220;We recognise patient hygiene is an integral part of patient care, and at times this has been challenging due to water related issues,&#8221; he said.<\/p>\n<p>Cardwell said when HNZ became aware of the water heating and pressure issues in 2023, it triggered investigations and &#8220;critical planned maintenance and investment&#8221; work was carried out, including the partial replacement of the heating plant in mid-2024.<\/p>\n<p>&#8220;The project work did not fully meet expectations meaning that remedial work to resolve water pressure issues is ongoing,&#8221; he said.<\/p>\n<p>Cardwell said while maintenance work continued, there were contingencies in place to minimise disruptions to patients.<\/p>\n<p>&#8220;We endeavour to relocate patients within the ward, where possible, or offer alternate shower facilities,&#8221; he said.<\/p>\n<h3>Other water network issues at Auckland City Hospital<\/h3>\n<p>On 29 January, a water outage in the hospital&#8217;s main building &#8211; building 32 &#8211; for more than 12 hours affected the hospital&#8217;s emergency department, inpatient wards, operating theatres, Starship Children&#8217;s hospital&#8217;s emergency department and cardiac ward.<\/p>\n<p>Cardwell said the shutdown was because of a &#8220;pipe fracturing and an absence of control valves&#8221;.<\/p>\n<p>He said there have been no further leaks in building 32 throughout February.<\/p>\n<p>The risks with the pipes were identified in mid-2022, and were at the time managed through &#8220;reactive maintenance processes&#8221;, said Cardwell.<\/p>\n<p>He said a detailed independent engineering review followed and a report was produced in mid-2023, recommending the investigation of long term solutions.<\/p>\n<p>&#8220;With incidents occurring more frequently in 2024, we sought concept designs and independent costings of options for phased remediation works,&#8221; he said.<\/p>\n<p>Cardwell said there were a number of minor leaks throughout 2024, with one major leak occurring in July 2024 &#8211; but would not confirm how many leaks had happened.<\/p>\n<p>He said leaks would have occurred in numerous locations across the hospital, and that RNZ would need to send an official information request to find out the number.<\/p>\n<p>On 18 February, Health Minister Simeon Brown announced $14 million of funding to replace Auckland City Hospital&#8217;s pipes which are more than two decades old.<\/p>\n<p>The minister said the project will take place over three phases, with the first phase expected to take over 13 months.<\/p>\n<p>Cardwell said the tender for the remediation works went live on 21 February and closed on 7 March.<\/p>\n<p>HNZ is expecting the works to begin in late April.<\/p>\n<p>HNZ confirmed that the $14 million is a reallocation of funding from the existing budget within the &#8220;facilities infrastructure remediation programme&#8221;, and will cover just the first phase of the works, while future funding of the project will need to be reviewed after completion of the first phase.<\/p>\n<p>Brown said he will consider advice on the future funding of the project in due course.<\/p>\n<p>HNZ said it was looking at an alternative temporary water supply during this project.<\/p>\n<p>Cardwell said at this stage, HNZ was not expecting any surgeries to be delayed or relocated as a result of repair works.<\/p>\n<p>Source: RNZ<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A man who was seriously ill with cancer and underwent a bone marrow transplant at Auckland City Hospital last year had to boil water in a kettle and use a disposable vomit bowl to wash themselves, because the ward had no running hot water. Health New Zealand (HNZ) confirmed it became aware of water heating [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":12986,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[174],"tags":[],"class_list":["post-12985","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nz-news"],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/thebuzz.apnanetwork.co.nz\/index.php?rest_route=\/wp\/v2\/posts\/12985","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thebuzz.apnanetwork.co.nz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thebuzz.apnanetwork.co.nz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thebuzz.apnanetwork.co.nz\/index.php?rest_route=\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/thebuzz.apnanetwork.co.nz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12985"}],"version-history":[{"count":1,"href":"https:\/\/thebuzz.apnanetwork.co.nz\/index.php?rest_route=\/wp\/v2\/posts\/12985\/revisions"}],"predecessor-version":[{"id":12987,"href":"https:\/\/thebuzz.apnanetwork.co.nz\/index.php?rest_route=\/wp\/v2\/posts\/12985\/revisions\/12987"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thebuzz.apnanetwork.co.nz\/index.php?rest_route=\/wp\/v2\/media\/12986"}],"wp:attachment":[{"href":"https:\/\/thebuzz.apnanetwork.co.nz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12985"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thebuzz.apnanetwork.co.nz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12985"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thebuzz.apnanetwork.co.nz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12985"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}